Airfield Lighting and Vault Replacement Project Groundbreaking

You’re Invited to Break Ground with Us

Date: Friday, May 8 | Time: 9:00 AM | Location: North Road Terminal, 500 Terminal Drive, Naples FL 34104
Join us for a groundbreaking ceremony as we mark the commencement of Naples Airport’s airfield lighting rehabilitation project. This significant upgrade marks Naples as the first warm-weather airport to have a raised lighting system. This is also a necessary replacement due to recent storm damage and improves overall resilience of the airfield. The project includes the replacement of runway and taxiway edge lights, runway threshold and end lights, airfield taxi guidance signs, lighting cables, conduits, the electrical vault and more.

Guests are asked to arrive at the North Road Terminal no later than 8:45 am to allow for transport time to the airfield groundbreaking site.

Name(Required)